Quality & Traceability

Traceability you can hand to an auditor

Every heat and lot followed from the goods receipt that brought it in to the finished item it went into — with the inspection records, certificates and non-conformances attached along the way.
  • Heat & lot genealogy
  • Inspection records
  • NCR & CAPA
  • Quality dashboard
Inspection

Three points, one record

Receipt inspection on the GRN, in-process inspection against the work order, final inspection before release. Accepted and rejected quantities move the right stock.
  • Receipt inspection
  • In-process
  • Final inspection
  • Accept & reject
Non-conformance

From finding to fix

Raise an NCR against the item, the order or the supplier, drive it into a corrective action, and close it with evidence.
  • NCR register
  • CAPA
  • Root cause
  • Closure evidence
Suppliers

Rated on what they delivered

Supplier scorecards built from the goods receipts and inspections already recorded, not from a separate survey.
  • Scorecards
  • On-time delivery
  • Quality rating
  • Evaluation history
特徴

Connected Features

Each area of ERPSync shares the same customers, products, people and ledger, so work done in one place is instantly available everywhere else.

Engineering & Drawings

A drawing register with revisions, bills of materials taken from the drawing, engineering change requests with their cost and schedule impact, and the as-built set.

もっと

Welding & Qualification

PQR, WPS and WPQ records, a welder qualification matrix, and the work-order check that stops an unqualified welder before the joint is made.

もっと

ビジネス全体を、ひとつに同期。

プロジェクト、販売、財務、在庫、製造、人事をひとつのプラットフォームに集約し、スプレッドシートの突き合わせから解放されましょう。

お問い合わせ

連絡する


私たちは革新的なアイデアを思いつくときに成功しますが、スマートなコンセプトは測定可能な結果でサポートされるべきであることも理解しています.