Engineering & Drawings

The drawing drives the job

The drawing is not a file in a folder. Its revision drives the bill of materials, the bill of materials drives what is purchased and made, and the change request that alters it shows what that will cost before anyone approves it.
  • Drawing register
  • Revision control
  • BOM from drawing
  • As-built set
Revisions

Nobody builds to an old revision

Every drawing carries its revision history. A superseded revision is marked as such, and the shop floor sees the current one.
  • Revision history
  • Superseded marking
  • Issue to shop floor
  • Attachments
Change control

An ECR that shows its price

Raise an engineering change request against the drawing, see the material and schedule impact, route it for approval, and release the ECN.
  • ECR raising
  • Cost & schedule impact
  • Approval routing
  • ECN release
As-built

What actually left the works

The as-built set records the drawing revisions the finished item was made to, and forms part of the handover dossier.
  • As-built drawings
  • Dossier inclusion
  • Customer handover
  • Audit record
特点

Connected Features

Each area of ERPSync shares the same customers, products, people and ledger, so work done in one place is instantly available everywhere else.

Welding & Qualification

PQR, WPS and WPQ records, a welder qualification matrix, and the work-order check that stops an unqualified welder before the joint is made.

更多的